South County Integrated Mobility Study

2.2 Vision for Future Growth Job concentration areas are identified by the Imagine 2040 plan as being key economic spaces that have great potential for growth based on 2010 jobs and 2040 job estimates (Figure 5). These areas include the Port Redwing & Big Bend Road Corridor, and the SR 674 Corridor.

Figure 5. Key economic spaces and potential growth (2010 and 2040 job estimates) Source: Hillsborough MPO - Imagine 2040: Long Range Transportation Plan, 2018

As part of the Imagine 2040 planning effort, the Planning Commission prepared the Hillsborough County Areawide Vision Map (Figure 6). The vision map is a composite of data that depicts the general plan for future growth throughout Hillsborough County. The vision map incorporates proposed major capacity projects and transit improvements from the long-range transportation plan, as well as annexations or changes to the USA.

12

Made with FlippingBook Learn more on our blog