UNDERGROUND UTILITIES- GSW

Wet Well & Underground Piping

The work consisted of a new sanitary sewer lift station in the same location as the existing lift station in Vallejo, CA. The new lift station consists of a new wet well with submersible pumps, an electrical and controls building with standby generator, and surge tank for hydraulic transient control.

Install Wet Well & Underground Piping 10’ Diameter Wet Well Sewer Drain Piping Site Drain Electrical Conduits Temporary Sewer Bypass System

www.gswconstruction.com

Made with FlippingBook interactive PDF creator