ADC GreenBook 6th Edition - JPL

4

INSPECTION & INSTALLATION

4.5.2 Support Spacing

Flexible duct shall be supported at maximum 4’ intervals horizontally and 6’ intervals for vertical risers.

Figure 16

16

Figure 17

4.5.3 Ceiling or Truss Supports

Ceiling beams or truss members may be used to support flexible duct provided they do not exceed 4’ intervals, and are at least 1 ½ ” wide.

Figure 18

Made with FlippingBook. PDF to flipbook with ease