ADC GreenBook 6th Edition - JPL

Table of Contents

Introduction

1

1

Scope

2

2

Common Terms

3

3

Design 3.1 Installation Restrictions and Use Limitations 3.2 Benefits 3.3 Common System Layouts 3.4 Sizing 3.5 Thermal Resistance 3.6 Thermal Performance Certification 3.7 UV Light 3.8 Fire Safety 3.9 Fire - Resistance Rated Assemblies 3.10 Bathroom Exhaust and Vents 3.11 Deeply Buried Duct

5 5 5 6 7 9 9

10 10 10 11 11 12 12 12 13 14 15 17 17 21 21 22 23 23 24 24 25 25 25 25 26 26 27 29 29 29 30 30

4

Inspection & Installation

4.1 Installation Key Points 4.2 Air Duct or Air Connector 4.3 Bends 4.4 Routing, Sagging & Snaking 4.5 Supporting Flexible Ducts 4.6 Compression 4.7 Installation Instructions

4.8 Fittings, Fasteners & Sealing 4.9 Typical Installation Locations 4.10 Contact with Fixtures 4.11 Leakage 4.12 Condensation 4.13 Field Alterations 4.14 Personal Protective Equipment (PPE)

ii

5

Care

5.1 Cleaning 5.2 Replacement 5.3 Repair

6

ADC Test Standards

6.1 Performance Values 6.2 Performance Requirements 6.3 Material Characteristics

6.4 Methods of Test 6.5 Product Marking 6.6 Product Certification 6.7 Product Packaging

7

Reference Standards

31

APPENDIX APPENDIX A Reference Pressure Drop Chart APPENDIX B UL181 Tests APPENDIX C Typical Duct Types APPENDIX D Duct Accessories APPENDIX E Flexile Duct Installation Checklist

32 32 33 34 35 37

Made with FlippingBook. PDF to flipbook with ease