196286 Arable Delegate Workbook final

Arable

Appendix 3: Plant protection product applicator check sheet

National Sprayer Testing Scheme - Operator Check Sheet

Owner: Model: Date:

Operator: Serial No:

Make: Reg No:

Hours/mileage:

Key:

Checked/Completed

Needs Attention Not Applicable

X

Adjusted

A

na

Regularly Mechanical  Is the attachment to tractor secure?  Is the chassis and structure free of cracks and rust?  Are the wheels and tyres in good condition?  Are guards, inc. PTO shaft guard, secure and undamaged? Hydraulic system, inc. tracking system if fitted.  Are they free from leaks under pressure?  Are the hoses and connections worn or cracked? Electrical system  Is the wiring undamaged & are all connections properly insulated?  Do all the lights work properly? Pneumatic system  Is the system free from leaks when under working under operating pressures? Sprayer tank  Are the tank/chassis fasteners secure?  Free from leaks?  Does the lid fit securely and free from leaks?  Is the contents gauge clearly legible? Boom  Is it properly latched when folded for transport?  When unfolded, is it straight and level?  Does the height adjustment and suspension work properly?  Does the boom return to level when displaced to left and right?  Are the break-backs functioning freely?  Are the mountings and linkages secure and not worn? 'Spray lines'  Are they free from leaks under pressure?  No hoses and connectors worn or cracked?  Are all valves and filters in good condition? Nozzles  Are all fittings and turrets in good condition?  Are all nozzles correctly orientated?  Are all check-valves working properly?  Is the spray/distribution pattern visually correct?

Regularly (cont) Controls and valves  Are the master on/off switches working correctly?  Are all boom section switches functioning?  Can you read the pressure gauges easily?  Are all labels appropriate and legible?  Is the pressure adjustment/stable?  Pressure gauge reading zero? Chemical induction system  Are the system and controls working properly?  Is it free from leaks under pressure?  Are all labels appropriate and readable?  Is the rinse system and container wash system working properly? Tank rinse system  Is the system functioning properly? External washdown  Is the system functioning properly? Personal  Water supply tank filled?  Is the clothing locker clean and contents complete? Periodically  Jug test all nozzle outputs

Date Completed ………………………….

 Formally complete and file check sheet

Next test due …………………………………

Comments/Notes/specific items requiring attention

60

Made with FlippingBook flipbook maker