FLARE PROJECTS
Project Flare stack refurbishment
Project Flare tip replacement
Project Flare tip replacement
Client ExxonMobil Location Mossmoran
Client KPOC
Client SBM
Location Malaysia
Location Malaysia
Zenith has successfully refurbished a 100m high flare stack at the ExxonMobil ethylene plant in Mossmorran. The project included the replacement of the upper section of the main riser including the replacement of the flare tip. New guy wires were installed to the new upper section. In addition, necessary repairs were carried out to the steam lines throughout the full height.
Zenith SAS worked closely with in house engineering team and designed and fabricated a bespoke temporary lifting gantry which was installed to the existing upper flare derrick to allow for the safe removal of the existing flare tip and the installation of the replacement flare tip by Zenith SAS Limited. Following a successful trial assembly and FAT, at Zenith’s dedicated Testing Facilities in Scotland, the equipment was shipped to the offshore platform for outage work scope.
Zenith Structural Access Solutions Limited was awarded the contract by SBM to design and install a temporary lifting frame to facilitate the replacement of a 300 kg flare tip on a FPSO located offshore in Malaysia. The design, supply and installation of the temporary lifting frame was carried out completely in-house. We have all of the skills in-house ranging from structural engineering design to specialist offshore installation crews
Telephone +44 (0)131 440 3000
Email enquiries@zenithstructural.com
Website zenithstructural.com
Made with FlippingBook - Online magazine maker