PROJECT PROFILE | MENIFEE, CA Acclaimed Stormwater System Saves Developer Millions Modular Wetlands® System Linear

A Forterra Company

Challenge The Bio Clean engineering team and veteran stormwater designers, were asked to evaluate the project’s existing stormwater management plan and provide insight. Immediately, they recognized a vastly more efficient solution. Within minutes they had formed a sketch and quote that would end up saving the developer millions of dollars, preventing further development delays. This incredible alternative solution was the Modular Wetlands System Linear

(MWS Linear), shown in Figure A. Introducing the MWS Linear’s collection of advantages immediately provided substantial benefits. Overnight, the contractor was able to suspend the construction on the first of the two river beds, whose build was already underway and demanding so much rock fill that a processing plant was established on-site just to produce the millions of pounds of rock needed for construction.

Figure A: Modular Wetlands® System Linear (Side-by-Side Orientation)

Solution As opposed to acres of custom land movement, construction time, and millions of dollars spent in labor and resources, the developers had a seemingly over-the-counter, cost-effective solution. What was prescribed is the stormwater industry’s flagship solutions and is often considered the standard for stormwater compliance. Just 18 weeks after the project’s first review and consultation, seven Modular Wetlands System Linears were delivered to the Audie Murphy Ranch development, marking an astounding 75% cost savings for the customer, but also unlocking the developer’s ability to finalize real estate occupancy permits months sooner than originally projected, and clearing them to close on new home sales.

Stormwater System Options

Space and Land Required

Cost

Turnaround Time

7 Precast Biofiltration Systems Totalling 1,184 Square Feet

Delivered & Installed Units $503,000

From Consultation to Delivery 18 Weeks

Modular Wetlands System Linear

Crushed Rock Estimate $Seven Figures Lost Land/Real Estate Estimate $Seven Figures

River Rock “Paseos” Totalling 50 Acres Length = 0.45 miles long Crushed Rock = 440,660 cf

Months of Extended Construction Time

Non Proprietary River Rock “Paseos”

5796 Armada Drive #250, Carlsbad, CA | 855.566.3938 | stormwater@forterrabp.com | www.biocleanenvironmental.com Not only is the Modular Wetlands System Linear a developer’s best friend - saving millions in land and construction costs - it is a superior treatment system that protects watersheds and impaired water bodies across the country. Its high-performance media and patented horizontal flow show equivalent or better pollutant removal to standard biofiltration. The system has also been issued Full Trash Capture Certification from the California State Water Resources Control Board and it is approved by the Washington State Department of Ecology TAPE program for General Use Level Designation (GULD). The MWS Linear is a precast horizontal flow biofiltration system, and for years this flagship Bio Clean solution has been giving engineers and contractors the ability to save millions in valuable land while fulfilling the contractor’s demands for rapid fulfillment and installation. The Modular Wetlands System Linear also has long-term cost benefits, as it is much easier and cost-effective to maintain over time compared to non-proprietary BMPs.