CONTURO Edge Bander booklet

3

5

The machine heats up until the setpoint temperature is reached. The heat-through phase then starts, which is indi- cated on the display. When the display changes from red to green, the machine is ready for operation. The CONTURO takes approximately eight minutes to fully heat up. The thermally isolated gluing unit ensures that the surface temperature of the machine remains low, thereby eliminating any risk of burns.

TIP You can also adjust the temperature individually: press the mode button until the temperature indicator flashes, set the desired temperature using the arrow buttons and press OK to confirm. GLUE QUANTITY  Page 61 For adapting the glue quantity  Chapter 5 SWITCHING UNITS The display can be switched from Celsius to Fahrenheit and metres to feet.

Display information

REMAINING EDGE LENGTH (Can be displayed in Feet or Metric)

TEMPERATURE IN °C OR °F

TEMPERATURE SETTING GLUE QUANTITY

ARROW BUTTONS FEED SPEED MODE

The display indicates how much edging can be processed at the preset edging height and glue quantity. The actual temperature is also displayed.

23

Made with FlippingBook - Online catalogs