Tampa Brass Aluminum Corp – AS9100D Quality Management System
W/I No.:
WI_OAT_JK400Q
Title: JetKote 400 Q Refractory Coating – Work Instruction
Rev: 0
Stop work
•
Document nonconformance
•
Proceed to re-application per Section 13
•
Inspector Initials: __________ Date / Time: __________
11.2 Visual Inspection
Verify:
Uniform coating coverage
•
Proper adhesion
•
No contamination
•
Proper edge coverage
•
Pass / Fail (circle one)
12. CURING
Cure coating per Engineering or manufacturer requirements.
Cure Start Time: __________ Cure Complete Time: __________
Do not proceed until curing is complete and approved.
13. NONCONFORMANCE & RE-APPLICATION
13.1 Conditions Requiring Re-Application
Thickness out of specification
•
Poor adhesion
•
Surface contamination
•
Damage during handling
•
13.2 Re-Application Procedure
Page 7 of 8