6. Refill the tube and close it 6.1 Add the polystyrene beads to the tube. 6.2 Replace the tube cap and secure it down.
7. Install the hospital-grade power supply 7.1 Position the power supply on the left side of the cabinet (confirm exact placement per site preference). Mark the mounting positions. 7.2 Using a 1/8” drill bit, drill pilot holes through the cabinet only at the marked locations. 7.3 Attach the power supply with the ¾" screws from the kit. 7.4 Plug the Hurricane Tube into the new hospital-grade power supply to test power and operation.
8. Finalize and tidy up 8.1 Fill any additional unused receptacle holes with the blank inserts provided. 8.2 Verify the Hurricane Tube runs smoothly, and the beads circulate correctly. 8.3 Confirm all screws are tight, the base is stable and level, and there is no wobble.
Made with FlippingBook - professional solution for displaying marketing and sales documents online