2016 CAPITAL PRECIS - CONTINUED
Solutions: Engage a reputable Golf Course Architect to professionally evaluate our current conditions and develop parameters for several different renovation options for Club Leadership to consider. For example:
Option 1. Address needs of existing golf course without introducing design alterations. Scope would most likely be limited to: re-grassing of tees, fairways and greens; rebuild bunkers in kind; repair cart paths and renovate the irrigation system. Option 2. Keeping the basic routing of the golf course intact, replace several of the most severe greens and re-contour others to alleviate drainage issues. Re-grass all playing areas, including rough. Evaluate bunkers and reconstruct to current industry standards, utilizing technologically enhanced products. Adjust locations of cart paths as necessary and replace with properly constructed and sized paths. Replace irrigation system in whole from the pump house to the heads. Fix the 18 th hole. Engage in tree management program (similar to what was done on the South) that will re-open sight-lines and vistas to showcase the property. Option 3. Engage in a complete re-build of the North Course.
x
Estimated Costs: Engage Golf Course Architect: $200,000
Option 1: $4.5 million Option 2: $7.0 million Option 3: $10.0 + million
Pros & Cons: Each option will provide unique positive and negative attributes which can be further identified and explored once a clearer path forward is determined.
8
Made with FlippingBook Digital Publishing Software