A CLOSER LOOK AT CAMDEN TOWN HALL
Repair of vaulted ceiling, these ceilings were reinforced concrete vaults which had to be demolished to allow access and repaired using 6mm board to allow the curve
The council chamber required a significant refurb due to water damage and asbestos. Errigal completed the full fit out from refurbing listed joinery to floor finishes and brass trims
Errigal's workmanship and attention to detail was second to none. We found them professional, pro-active in all aspects of this high end fit out on this fantastic historical building" Tom Parrott , Lendlease Project Director
These pictures show the council wedding suites, Errigal completed the full fit out from floor finishes to folding walls to decoration and specialist joinery