2020 Local Hazard Mitigation Plan

Appendix E – 2005 Irvine Hazard Mitigation Plan - Mitigation Action Items Summary

Natural Hazard

Action Item

Coordinating Organization(s) Community Services, Emergency Management

Timeline Ideas for Implementation (Summary)

Incorporated into 2020 LHMP Mitigation Actions Mitigation actions 1.01, 1.02, 1.06, and 1.07 address this issue.

Identify critical City facilities that require backup power capability for use during a power failure. Establish a priority list to be implemented as part of the City's Strategic Business Plan. Develop an awareness campaign to provide public information materials to City residents, pertinent to the protection of life and property before, during, and after a windstorm. During building plan check to ensure compliance with UBC standards followed by a field inspection of construction.

Ongoing Determine backup power equipment requirements for critical facilities; create equipment/testing log to ensure backup equipment is in working service; test all critical facility backup power generators on a regular basis Ongoing Compile existing windstorm hazard mitigation brochures: distribute these materials to City of Irvine residents create a community awareness training presentation.

#2

Emergency Management, Public Information Office

Mitigation actions 11.01 and 11.07 address this issue.

#3

Community Development

Ongoing Provide all inspectors with current UBC standards, as well as updates

This is a standard practice of the City and was not deemed an action necessary in this plan update.