Nexus Magazine - Edition 04

A SAFER project can effectively have five clients: the community water system receiving assistance, a neighbouring system involved in consolidation, parallel technical-assistance providers, regulators and funding agencies. Each may define success differently and each can influence whether a proposed solution moves forward. In extreme cases, projects can be cancelled for what seem like minor disagreements. In one case, a proposed consolidation was called off because the two systems had different methods for regulating water pH and could not agree on which to use. The best design and engineering will ultimately mean nothing if the process doesn’t create a project that all the actors can accept. Even if geology and local politics align, small rural communities sometimes lack the institutions needed to oversee a water system. SAFER often works with small organisations rather than conventional utilities. They may be privately owned, community-run systems or volunteer-managed.

In another case, the West Park mobile-home community had long struggled with water supply problems caused by a contaminated well and in 2018 sought to consolidate its water system with that of nearby Crescent City.⁴ But this required making improvements inside the privately-owned mobile-home park, which didn’t have the staff to administer public funding and oversee the work. Crescent City couldn’t administer public funds for improvements on private property. The solution was to approach Del Norte County about filling that role and the county agreed. The obstacle wasn't missing technology, but a missing institution capable of carrying the project forward. Learning curve Even when connecting to a neighbouring water system offers the most practical solution, making that arrangement work requires securing the cooperation of another community with its own priorities and concerns. The Sierra North water system in Owens Valley serves about 40 people. It has no meters or backup power, has excessive fluoride and stores water in railroad tanker cars. We reached out to Sierra Grande Estates, a nearby mutual water company willing to consider consolidation.

Three projects, three kinds of obstacle

Bodega

West Park

Sierra North

From design to delivery Delivering safe water to small, disadvantaged communities rarely fits neatly within the boundaries of engineering. Sometimes, there is no clear solution at the outset. Sometimes, successful delivery requires adapting to new information. Sometimes, it means responding to change, pivoting away from months or years of work when one solution reaches a dead end and pursuing another. SAFER projects reflect a broader reality for small water systems: technical solutions have to fit the communities and institutional structures that will ultimately support and sustain them. These projects demonstrate that having the technical skills to build a water system is just one part of delivering one that works.

We initially approached this as a linear problem. But no linear solution met the combination of technical, regulatory and system expectations. Our first proposed solution met the technical and regulatory requirements but not the needs of Sierra Grande. That early misstep nearly caused them to walk away. GHD brought in an engagement specialist in response, who conveyed the combined challenge to all parties. The collaboration found a path, through additional data gathering, adaptation by all actors and the rebuilding of trust. A year later, Sierra Grande’s members voted to support consolidation and the project is headed to construction. The solution had to work for everyone, but the pathway had to allow for adaptation before that solution could appear.

Community

Mobile-home community

Mobile-home community

About 40 people

Dry well, policy change, and Bodega Bay backing out.

Private property, and no institution able to administer public funds.

A first proposal that didn't meet Sierra Grande's needs.

Obstacle

An engagement specialist, more data and rebuilt trust, then a member vote a year later.

What unlocked it

Del Norte County taking on the administering role.

The intertie.

References 1. California State Water Resources Control Board. "Safe and Affordable Funding for Equity and Resilience.www.waterboards.ca.gov/water_issues/programs/grants_loans/ sustainable_water_solutions/safer.html 2. California State Water Resources Control Board. 2026. "2026 Drinking Water Needs Assessment." June 2026. www.waterboards.ca.gov/drinking_water/certlic/ drinkingwater/documents/needs/2026needsassessment.pdf

3. California State Water Resources Control Board. 2025. "2025 SAFER Drinking Water Needs Assessment: Fact Sheet. www.waterboards.ca.gov/drinking_water/certlic/ drinkingwater/documents/needs/2025/2025-needs-factsheet.pdf 4. City of Crescent City. 2019. "Agenda: Regular City Council Meeting, January 7, 2019." Crescent City, CA. https://www.crescentcity.org/media/Agendas/2019/ January%207th%202019.pdf

26 | GHD | Nexus Magazine

Nexus Magazine | GHD | 27

Made with FlippingBook - professional solution for displaying marketing and sales documents online