GCMP Additions Booklet

PROPOSED BUDGET BREAKDOWN

STARTER SHACK / LEARNING CENTER

Breakdown

Starter Shack Learning Studio TOTAL

100 Soil Boring and Tree survey

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

2,000

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

4,000

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

6,000

202 DRC Approval 207 Building Permits 211 Builders Risk 215 Utilities Relocation

-

10,000 36,000 11,250 50,000 120,750 61,000

10,000 44,000 13,750 50,000 159,250 74,000

8,000 2,500

-

301 Project Management (Owner's Rep)

38,500 13,000

302 Architect

303 Civil Engineer

- -

- -

- -

304 Site planner - Landscaping

307 Surveying, Testing, Threshold and Legal Fees

6,300

28,350

34,650

405 Hard Cost (GC)

150,000 20,000

1,800,000

1,950,000

407 Demolition, Site Work

275,000 20,750 380,000 80,000

295,000 22,450 380,000 100,000

411 P&P Bond

1.0%

1,700

601 Trackman Studio and Range Technology

-

602 Furniture 604 Signage

20,000

1,000 5,000

4,500

5,500

605 Security/Access Control/CCTV/Fiber/A/V

145,000

150,000

268,000

3,026,600

3,294,600

500 Contingency

30%

$

80,400

$

907,980

$

988,380

$

4,282,980

Subtotal (Starter Shack / Learning Studio):

$

-

$

-

Additional Funding GCMP Phase 1a (from pg. 14)

$

804,037

TOTAL UNDER CONSIDERATION $

5,087,017