Confidentiality Notice: This electronic message contains information from ElQuator Sdn Bhd which may be privileged or confidential. The information is intended to be for the use of the individual(s) or entity named above. If you are not the intended recipient be aware that any disclosure, copying, distribution or use of the contents of this information is prohibited. If you have received this electronic message in error, please notify us by telephone or email (to the numbers or address above) immediately.
Status Report: Project Evergreen
Project coordinator : Henrik Pryter
Expected finish delivery December, 2023 Product: 1.Surplus Energy Generator System 2.Stand-Alone Hydro System 3.Compressed Air Buoyancy System
Overview
SYSTEM BRIEF
SYSTEM QUANTITY 1.Surplus Energy Generator System 4 SYSTEM
2.Stand-Alone Hydro System
3 LINE SYSTEM
3.Compressed Air Buoyancy System 3 SYSTEM
CONCURRENT PROGRESS
1.Order Received 2.Material ordered 3.Container arrived 4.Fiberglass start manufacturing
CONTAINER
Surplus Energy Generator System
DRAWING FOR SURPLUS ENERGY GENERATOR
FIBERGLASS AND POWDER COATING SECTION
PACK TO CONTAINER
Compressed Air Buoyancy System
FIBERGLASS IN THE MAKING
PACK TO CONTAINER
Stand-Alone Hydro System
WRAPPING
PACK INSIDE CONTAINER
Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29Made with FlippingBook - professional solution for displaying marketing and sales documents online