TREX ® JOIST MOUNT POSTS Installation Guidelines Installation Guidelines
FASCIA MOUNT (OUTSIDE FRAME CORNER)
» TREX FASCIA MUST BE USED, OR BOLTS MUST BE CUT DOWN.* » INSTALL POST TIGHTLY ON RIM JOIST FIRST – NUTS WILL BE INACCESSIBLE LATER. » MUST USE TREX FASCIA MOUNT CORNER BRACKET KIT .
Trex Fascia Mount Corner Bracket (Kit)
Trex Fascia Mount Kit (L Bracket)
Trex Fascia
3 Bolts* 1/2" x 6" (13 mm x 152 mm), Nuts, and Washers
1 Bolt 1/2" x 10" (13 mm x 254 mm), Nut, and Washer
NOTE: If a L70Z is in this location, it must be removed so post mount will fit properly.
Simpson L70Z
Simpson LUS28Z
Front Rim Joist
Side Joist
Simpson DTT2Z
1. Install post on rim joist and fully tighten using Simpson DTT2Z on top bolt. 2. Run 10 " (254 mm) bolt through gap in existing Simpson DTT2Z and tighten into second DTT2Z. 3. Install bottom bolt. TREX SIGNATURE RAILING APPLICATIONS Installation of Railing 1. A ll required hardware is included with Trex Signature railing. Follow Trex Signature railing instructions for complete installation requirements.
8
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
JPM-0825
Made with FlippingBook - Share PDF online