SECTION 2. CUSTOMERS, STAKEHOLDERS AND SERVICE LEVELS
36

Customer experience – a more comprehensive way to measure how we meet our customer needs
36

2.1 STAKEHOLDER REQUIREMENTS
37

2.2 CUSTOMER EXPERIENCE
39

2.2.1 CUSTOMER EFFORT MEAN SCORE (CEMS) SERVICE LEVEL
39

2.2.2 SPEED OF QUOTES FOR NEW CONNECTIONS (SMALL CONNECTION CUSTOMERS) SERVICE LEVEL
39

2.2.3 ADVANCE NOTIFICATION OF PLANNED OUTAGES SERVICE LEVEL
40

2.2.4 CALL CENTRE GRADE OF SERVICE (GOS) SERVICE LEVEL
40

2.3 SAFETY
41

2.3.1 TOTAL RECORDABLE INJURY FREQUENCY RATE SERVICE LEVEL
41

2.3.2 ASSET SAFETY INCIDENT SERVICE LEVEL
41

2.4 RELIABILITY
42

2.4.1 SYSTEM AVERAGE INTERRUPTION FREQUENCY INDEX (SAIFI) SERVICE LEVEL
42

Remote Safety Isolations
43

Planned works
43

Third-Party Damage
43

2.4.2 NUMBER OF CUSTOMER INTERRUPTIONS PERFORMANCE AGAINST AGREED SERVICE STANDARDS SERVICE LEVEL
43

2.5 RESILIENCE
44

2.5.1 PERFORMANCE AGAINST OUR SECURITY OF SUPPLY STANDARD (SOSS) SERVICE LEVEL
44

2.5.2 SYSTEM AVERAGE INTERRUPTION DURATION INDEX (SAIDI) SERVICE LEVEL
45

Remote Safety Isolations
46

Planned works
46

Third-Party Damage
46

Overhead asset incidents
46

Underground asset incidents
46

2.6 CYBER SECURITY AND PRIVACY
47

2.6.1 INCIDENT DETECTION SERVICE LEVEL
47

2.6.2 INCIDENT RESPONSE SERVICE LEVEL
47

2.6.3 INCIDENT CONTAINMENT SERVICE LEVEL
48

2.6.4 PRIVACY
48

SECTION 3. ASSET MANAGEMENT SYSTEM
50

3.1 ASSET MANAGEMENT VALUES AND OBJECTIVES
50

3.2 ASSET MANAGEMENT SCOPE
51

3.3 ASSET MANAGEMENT ORGANISATION AND GOVERNANCE
52

3.4 KEY DOCUMENTS
54

3.5 ASSET MANAGEMENT SYSTEM
57

3.6 ASSET INVESTMENT PROCESS
60

3.7 ASSET MANAGEMENT IMPROVEMENT
65

3.8 ENABLING THE ASSET MANAGEMENT SYSTEM THROUGH INFORMATION SYSTEMS
66

ASSET MANAGEMENT INFORMATION SYSTEMS
67

PRIMARY SYSTEMS
67

OTHER IMPORTANT SYSTEMS
68

3.9 DATA AND INFORMATION MANAGEMENT
68

3.10 CYBER SECURITY & PRIVACY
70

3.11 SUSTAINABILITY
71

3.12 EMERGENCY RESPONSE AND CONTINGENCY PLANS
72

SECTION 4. OUR ASSETS
75

4.1 OUR NETWORK MANAGEMENT STRATEGIES
75

4.1.1 OVERVIEW
75

4.1.2 OUR RELIABILITY AND RESILIENCE STRATEGY
76

Microgrids
77

Undergrounding
77

Distribution Automation
77

Smart Meters
77

Vegetation Management
78

Customer Options to Improve Resilience
78

4.1.3 OUR NETWORK PLANNING STRATEGY
78

4.1.4 OUR EQUIPMENT CAPACITY ASSESSMENT STRATEGY
79

4.1.5 OUR LOAD DEMAND STRATEGY
79

4.1.6 OUR CBARM, REFURBISHMENT AND REPLACEMENT STRATEGY
80

4.1.7 OUR MAINTENANCE STRATEGY
81

4.1.8 OUR VEGETATION MANAGEMENT STRATEGY
82

4.1.9 OUR POWER QUALITY STRATEGY
83

4.1.10 OUR CLIMATE CHANGE AND SUSTAINABILITY STRATEGY
83

Circular economy approach to materials
83

Environmental impacts
84

Carbon reduction
84

4.1.11 OUR SAFETY IN DESIGN STRATEGY
84

4.1.12 OUR CUSTOMER INSIGHTS AND SUPPORTING DATA AND ANALYTICS STRATEGY
84

Networks Information Management Strategy
85

Tools Used (WiP)
86

4.1.13 OUR INFORMATION SYSTEMS AND DIGITAL TECHNOLOGY STRATEGY
87

4.1.14 OVERVIEW OF OUR NETWORK SUPPLY AREA
89

4.1.15 OVERVIEW OF OUR ASSETS
90

4.2 SUBTRANSMISSION
91

4.2.1 SUBTRANSMISSION 110 KV UNDERGROUND CABLES
91

Overview
91

Population and age
92

Condition and health
92

Strategy
92

4.2.2 SUBTRANSMISSION 33 KV AND 22 KV UNDERGROUND CABLES
92

Overview
92

Population and age
93

Condition and health
94

Strategy
94

4.2.3 SUBTRANSMISSION 110 KV OVERHEAD LINES
94

Overview
94

Population and Age
95

Condition and Health
95

Strategy
95

4.2.4 SUBTRANSMISSION 33 KV AND 22 KV OVERHEAD LINES
95

Overview
95

Population and age
95

Condition and health
96

Strategy
96

4.3 ZONE SUBSTATIONS
97

Overview
97

Population and Age
97

Condition and Health
97

Strategy
98

4.3.1 POWER TRANSFORMERS
98

Overview
98

Population and Age
99

Condition and Health
99

Strategy
99

4.3.2 PRIMARY SWITCHGEAR
100

Overview
100

Population and Age
100

Condition and Health
101

Strategy
101

4.3.3 BATTERY ENERGY STORAGE SYSTEMS (BESS) AND MICROGRIDS
101

Overview
101

Population and Age
102

Condition and Health
102

Strategy
102

4.3.4 CAPACITOR BANKS AND STATIC COMPENSATORS
102

Overview
102

Population and Age
102

Condition and Health
103

Strategy
103

4.3.5 LOAD CONTROL
103

Overview
103

Population and Age
104

Condition and Health
104

Strategy
104

4.3.6 FIRE AND SECURITY SYSTEMS
104

4.4 DISTRIBUTION FEEDERS HV
105

4.4.1 DISTRIBUTION FEEDERS HV OVERHEAD
105

Overview
105

Population and Age
105

Condition and Health
106

Strategy
107

4.4.2 DISTRIBUTION FEEDERS OH SUPPORTS
108

Overview
108

Population and Age
108

Condition and Health
109

Strategy
109

4.4.3 DISTRIBUTION FEEDERS HV UNDERGROUND
109

Overview
109

Population and Age
110

Condition and Health
111

Strategy
111

4.5 DISTRIBUTION FEEDERS LV
112

Overview
112

4.5.1 DISTRIBUTION FEEDERS LV OVERHEAD
112

Population and Age
112

Condition and Health
112

4.5.2 DISTRIBUTION FEEDERS LV UNDERGROUND
113

Population and Age
113

Condition and Health
113

4.5.3 DISTRIBUTION SOLAR AND BATTERY DISTRIBUTED GENERATION
113

Population and Age
113

Condition and Health
114

4.5.4 DISTRIBUTION EV CHARGERS
115

Overview
115

Population and Age
115

Condition and Health
115

Strategy
115

4.5.5 RESIDENTIAL EV CHARGERS
115

Overview and Strategy
115

4.5.6 STRATEGY FOR THE LV NETWORK
115

4.6 DISTRIBUTION GROUND MOUNTED SUBSTATIONS
116

Population and Age
116

Strategy
116

4.6.1 DISTRIBUTION GROUND MOUNTED SWITCHGEAR
117

Overview
117

Population and Age
117

Condition and Health
118

Strategy
119

4.6.2 DISTRIBUTION GROUND MOUNTED TRANSFORMERS
119

Overview
119

Population and Age
119

Condition and Health
121

Strategy
122

4.6.3 DISTRIBUTION SUBSTATIONS LV FRAMES
123

4.6.4 DISTRIBUTION POLE MOUNTED TRANSFORMERS
123

Overview
123

Population and Age
123

Condition and Health
124

Strategy
125

4.6.5 DISTRIBUTION VOLTAGE REGULATORS
125

Overview
125

Population and Age
125

Condition and Health
125

Strategy
126

4.7 SECONDARY SYSTEMS
126

4.7.1 PROTECTION SYSTEMS
126

Overview
126

Population and Age
126

Condition and Health
127

Strategy
127

4.7.2 TRANSFORMER MANAGEMENT SYSTEMS
127

Overview
127

Population and Age
127

Condition and Health
128

Strategy
128

4.7.3 POWER QUALITY METERS
128

Overview
128

Population and Age
128

Condition and Health
129

Strategy
129

4.7.4 NETWORK AUTOMATION SYSTEMS
129

Overview
129

Condition and Health
130

Strategy
130

4.7.5 DC SUPPLIES
130

Overview
130

Population and Age
131

Condition and Health
131

Strategy
131

4.7.6 EARTHING SYSTEMS
131

Overview
131

Condition and Health
131

Strategy
132

4.8 COMMUNICATIONS NETWORKS
132

4.8.1 PILOT CABLES
132

Overview
132

Population and Age
132

Condition and Health
132

Strategy
132

4.8.2 RADIO LINKS
132

Overview
132

Population and Age
133

Condition and Health
133

Strategy
133

4.8.3 NETWORK ROUTER REPLACEMENT PROGRAMME
133

Overview
133

Population and Age
133

Condition and Health
133

Strategy
133

4.9 OVERVIEW OF OUR DIGITAL NETWORK ASSETS
134

4.9.1 NETWORK OPERATIONS
134

Overview
134

Current state & stage in application lifecycle
135

Strategy & Plan for period
136

4.9.2 CUSTOMER OPERATIONS
136

Overview
136

Current State & Stage in application lifecycle
136

Strategy & Plan for period
136

4.9.3 MAINTENANCE & CONSTRUCTION AND RECORDS & ASSET MANAGEMENT
137

Overview
137

Current state & stage in application lifecycle
137

Strategy & Plan for the period
137

4.9.4 NETWORK EXTENSION PLANNING
137

Overview
137

Current state & stage in application lifecycle
138

Strategy & Plan for Period
138

SECTION 5. HOW WE MANAGE THE LIFECYCLE OF OUR ASSETS
140

5.1 NETWORK DEVELOPMENT
141

options assessment
143

Forecast investment summary
145

needs statement silverdale
145

Targeted Outcomes
145

OPTIONS ASSESSMENT
145

FORECAST INVESTMENT SUMMARY
147

NEEDS STATEMENT - ALBANY
147

TARGETED OUTCOMES
148

OPTIONS ASSESSMENT
148

FORECAST INVESTMENT SUMMARY
149

NEEDS STATEMENT – WAIRAU RD
149

TARGETED OUTCOMES
149

OPTIONS ASSESSMENT
150

FORECAST INVESTMENT SUMMARY
151

NEEDS STATEMENT – HENDERSON
151

TARGETED OUTCOMES
151

OPTIONS ASSESSMENT
151

FORECAST INVESTMENT SUMMARY
153

NEEDS STATEMENT – HEPBURN
153

TARGETED OUTCOMES
154

OPTIONS ASSESSMENT
154

FORECAST INVESTMENT SUMMARY
154

NEEDS STATEMENT – CBD
154

TARGETED OUTCOMES
155

OPTIONS ASSESSMENT
155

FORECAST INVESTMENT SUMMARY
157

NEEDS STATEMENT – PENROSE
157

TARGETED OUTCOMES
157

OPTIONS ASSESSMENT
157

FORECAST INVESTMENT SUMMARY
158

NEEDS STATEMENT – PAKURANGA
158

TARGETED OUTCOMES
158

OPTIONS ASSESSMENT
158

FORECAST INVESTMENT SUMMARY
159

NEEDS STATEMENT – MANGERE
159

TARGETED OUTCOMES
159

OPTIONS ASSESSMENT
159

FORECAST INVESTMENT SUMMARY ($MILLION NOMINAL)
160

NEEDS STATEMENT – WIRI
160

TARGETED OUTCOMES
160

OPTIONS ASSESSMENT
160

FORECAST INVESTMENT SUMMARY ($MILLION NOMINAL)
161

NEEDS STATEMENT – TAKANINI
161

TARGETED OUTCOMES
161

OPTIONS ASSESSMENT
161

FORECAST INVESTMENT SUMMARY ($MILLION NOMINAL)
162

NEEDS STATEMENT – LV NETWORK REINFORCEMENTS
162

TARGETED OUTCOMES
162

OPTIONS CONSIDERED
162

FORECAST INVESTMENT SUMMARY ($MILLION NOMINAL)
163

NEEDS STATEMENT – SYMPHONY SCENARIO OUTCOMES
163

OPTIONS ASSESSMENT
164

FORECAST INVESTMENT SUMMARY ($MILLION NOMINAL)
164

NEEDS STATEMENT – UNSPECIFIED REINFORCEMENT PROGRAMMES
164

TARGETED OUTCOMES
165

OPTIONS CONSIDERED
165

FORECAST INVESTMENT SUMMARY ($MILLION NOMINAL)
165

NEEDS STATEMENT
165

TARGETED OUTCOMES
166

OPTIONS CONSIDERED
166

FORECAST INVESTMENT SUMMARY ($MILLION NOMINAL)
167

NEEDS STATEMENT
167

TARGETED OUTCOMES
168

OPTIONS CONSIDERED
168

FORECAST INVESTMENT SUMMARY ($MILLION NOMINAL)
168

5.1.1 ZONE SUBSTATION AND DISTRIBUTION FEEDER PROGRAMMES
168

NEEDS STATEMENT
168

TARGETED OUTCOMES
169

OPTIONS CONSIDERED
169

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
169

5.1.2 CUSTOMER CONNECTIONS
169

NEEDS STATEMENT
170

OPTIONS CONSIDERED
170

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
170

5.1.3 RELOCATIONS
171

NEED STATEMENT
171

OPTIONS CONSIDERED
171

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
171

NEEDS STATEMENT
171

OPTIONS CONSIDERED
172

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
172

5.2 OPERATE, MAINTAIN, RENEW AND REPLACE
172

TARGETED OUTCOMES
174

OPTIONS CONSIDERED
174

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
174

MAINTENANCE CAPEX
174

MAINTENANCE OPEX
174

NEEDS STATEMENT
175

TARGETED OUTCOMES
175

OPTIONS CONSIDERED
175

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
176

NEEDS STATEMENT
176

TARGETED OUTCOMES
176

OPTIONS CONSIDERED
176

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
176

CONDITION BASED ASSET RISK MANAGEMENT (CBARM)
177

NEEDS STATEMENT
177

TARGETED OUTCOMES
177

OPTIONS CONSIDERED
177

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
178

5.2.1 SUBTRANSMISSION FEEDERS
178

NEEDS STATEMENT
178

TARGETED OUTCOMES
178

OPTIONS CONSIDERED
179

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
179

5.2.2 ZONE SUBSTATIONS
179

NEEDS STATEMENT
179

TARGETED OUTCOMES
180

OPTIONS CONSIDERED
180

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
181

NEEDS STATEMENT
181

TARGETED OUTCOMES
182

OPTIONS CONSIDERED
182

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
182

NEEDS STATEMENT
182

TARGETED OUTCOMES
183

OPTIONS CONSIDERED
183

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
184

NEEDS STATEMENT
184

TARGETED OUTCOMES
185

OPTIONS CONSIDERED
185

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
185

NEEDS STATEMENT
185

TARGETED OUTCOMES
186

OPTIONS CONSIDERED
186

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
187

NEEDS STATEMENT
187

TARGETED OUTCOMES
187

OPTIONS CONSIDERED
187

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
188

NEEDS STATEMENT
188

TARGETED OUTCOMES
188

OPTIONS CONSIDERED
188

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
189

5.2.3 DISTRIBUTION FEEDERS (HV & LV)
189

NEEDS STATEMENT
189

TARGETED OUTCOMES
190

OPTIONS CONSIDERED
190

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
191

NEEDS STATEMENT
191

TARGETED OUTCOMES
192

OPTIONS CONSIDERED
192

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
192

NEEDS STATEMENT
193

TARGETED OUTCOMES
193

OPTIONS CONSIDERED
193

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
193

NEEDS STATEMENT
194

TARGETED OUTCOMES
194

OPTIONS CONSIDERED
194

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
194

NEEDS STATEMENT
194

TARGETED OUTCOMES
195

OPTIONS CONSIDERED
195

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
195

NEEDS STATEMENT
195

TARGETED OUTCOMES
196

OPTIONS CONSIDERED
196

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
197

NEEDS STATEMENT
197

OPTIONS CONSIDERED
198

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
198

NEEDS STATEMENT
198

TARGETED OUTCOMES
198

OPTIONS CONSIDERED
199

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
199

5.2.4 DISTRIBUTION SUBSTATIONS AND VOLTAGE REGULATORS
199

NEEDS STATEMENT
199

TARGETED OUTCOMES
200

OPTIONS CONSIDERED
200

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
201

NEEDS STATEMENT
201

TARGETED OUTCOMES
203

OPTIONS CONSIDERED FOR POLE MOUNTED AND GROUND MOUNTED TRANSFORMERS
203

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
203

5.2.5 SECONDARY SYSTEMS AND OTHER NETWORK ASSETS
203

NEEDS STATEMENT
203

TARGETED OUTCOMES
204

OPTIONS CONSIDERED
204

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
204

NEEDS STATEMENT
204

TARGETED OUTCOMES
205

OPTIONS CONSIDERED
205

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
205

NEEDS STATEMENT
205

TARGETED OUTCOMES
206

OPTIONS CONSIDERED
206

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
207

NEEDS STATEMENT
207

TARGETED OUTCOMES
208

OPTIONS CONSIDERED
208

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
208

NEEDS STATEMENT
208

TARGETED OUTCOMES
209

OPTIONS CONSIDERED
209

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
210

NEEDS STATEMENT
210

TARGETED OUTCOMES
211

OPTIONS CONSIDERED
211

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
212

NEEDS STATEMENT
212

TARGETED OUTCOMES
212

OPTIONS CONSIDERED
213

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
213

NEEDS STATEMENT
213

TARGETED OUTCOMES
213

OPTIONS CONSIDERED
214

PREFERRED OPTION
214

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
214

5.3 NON-NETWORK ASSETS
214

5.3.1 INFORMATION SYSTEMS, PROCESSES AND DATA
214

5.3.2 SIGNIFICANT PROGRAMMES OF WORK
215

ONGOING CUSTOMER ENGAGEMENT TRANSFORMATION
215

TARGETED OUTCOMES
215

OPTIONS CONSIDERED
215

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
216

NEEDs STATEMENT
216

TARGETED OUTCOMES
216

OPTIONS CONSIDERED
216

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
217

NEEDS STATEMENT
217

TARGETED OUTCOMES
217

OPTIONS CONSIDERED
217

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
218

NEEDS STATEMENT
218

TARGETED OUTCOMES
218

OPTIONS CONSIDERED
218

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
219

NEEDS STATEMENT
219

TARGETED OUTCOMES
219

OPTIONS CONSIDERED
219

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
220

NEEDS STATEMENT
220

TARGETED OUTCOMES
220

OPTIONS CONSIDERED
220

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
220

NEEDS STATEMENT
221

TARGETED OUTCOMES
221

OPTIONS CONSIDERED
221

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
221

5.3.3 NETWORK CENTRIC CAPABILITY INVESTMENTS
221

NEEDS STATEMENT
222

TARGETED OUTCOMES
223

OPTIONS CONSIDERED
223

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
224

NEEDS STATEMENT
224

TARGETED OUTCOMES
224

OPTIONS CONSIDERED
224

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
224

NEEDS STATEMENT
225

TARGETED OUTCOMES
225

OPTIONS CONSIDERED
225

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
226

5.4 OTHER INFORMATION SYSTEM, PROCESS AND DATA INVESTMENTS
226

NEEDS STATEMENT
226

Targeted Outcomes
226

OPTIONS CONSIDERED
226

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
227

NEEDS STATEMENT
227

TARGETED OUTCOMES
227

OPTIONS CONSIDERED
227

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
228

NEEDS STATEMENT
228

TARGETED OUTCOMES
228

OPTIONS CONSIDERED
228

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
228

NEEDS STATEMENT
229

TARGETED OUTCOMES
229

OPTIONS CONSIDERED
229

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
229

NEEDS STATEMENT
230

TARGETED OUTCOMES
230

OPTIONS CONSIDERED
230

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
230

5.5 NON-NETWORK OPEX
230

PROPOSED INVESTMENT SUMMARY ($MILLION NOMINAL)
230

SECTION 6. Delivering our Plan
232

6.1 PRIORITISING OUR WORKS PORTFOLIO
232

6.2 OUR RESOURCE REQUIREMENTS AND CONSTRAINTS
233

6.3 DELIVERING OUR PROJECTS
234

6.4 INVESTMENT PLAN
234

CAPEX FORECAST
235

OPEX FORECAST
237

SECTION 7. APPENDICES
241

Appendix 1 Glossary of Terms
242

Appendix 2 Key Asset Strategies and Standards
245

Appendix 3 Typical Load Profiles
249

LARGE CUSTOMERS THAT HAVE A SIGNIFICANT IMPACT ON NETWORK
251

Appendix 4 AMP Information Disclosure Compliance
252-253

Appendix 5 Significant Changes from 2018 AMP
266

Appendix 6 Forecast Capital Expenditure (Schedule 11a)
270-271

Appendix 6 Forecast Capital Expenditure (Schedule 11a)
270-271

Appendix 7 Forecast Operational Expenditure (Schedule 11b)
278-279

Appendix 7 Forecast Operational Expenditure (Schedule 11b)
278-279

Appendix 8 Asset Condition (Schedule 12a)
280-281

Appendix 8 Asset Condition (Schedule 12a)
280-281

Appendix 9 Forecast Capacity (Schedule 12b)
284-285

Appendix 9 Forecast Capacity (Schedule 12b)
284-285

Appendix 10 Forecast Network Demand (Schedule 12c)
290

Appendix 10 Forecast Network Demand (Schedule 12c)
290

Appendix 11 Forecast Interruptions and Duration (Schedule 12d)
291

Appendix 11 Forecast Interruptions and Duration (Schedule 12d)
291

Appendix 12 Asset Management Maturity (Schedule 13)
292-293

Appendix 12 Asset Management Maturity (Schedule 13)
292-293

Appendix 13 Mandatory Explanatory Notes on Forecast Information (Schedule 14a)
308

Appendix 14 Certificate for Year Beginning Disclosures
309

Made with FlippingBook - professional solution for displaying marketing and sales documents online