Directors Report

PRIORITY TWO - 2022

Priority Road Name

Width Length

Area PCC Repairs AC Repairs Surface Treatment

Cost

Seal Coat Seal Coat Seal Coat Seal Coat AC Overlay Seal Coat Seal Coat Seal Coat Seal Coat Seal Coat Seal Coat Seal Coat

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

12,689.00 26,246.12 91,642.18 13,947.00 880.00 39,559.40 31,530.48 39,559.40 9,136.00 9,136.00 476.52 426.36 20,000.00 5,904.57 7,500.00 9,500.00

60

2,500 5,200

2 Hibiscus Dr 2 Hibiscus Dr

30 27 20 19 20 19 19 19 19 19 19 19

290 698 200 755 114

8,700

18,846

120

2 Club House DW Main

4,000

2 Sunrise Cir 2 Sunrise Cir

4,101

77,919 15,100 25,270 19,684 2,166

300 100

20,000

1,500

2 Sunrise Cir Parking 2 Sunflower Cir 2 Oleander Dr 2 Primrose Cir 2 Sage Ln 2 Cactus Ln 2 Oleander Dr Parking

1,330 1,036

100

10,000

80

8,000

102

1,938

1,330

25,270

100

10,000

200 200

3,800 3,800

60 60

1,600 1,600

Misc. Costs

Total

295,228.46 $

Inflation

Engineering (PSE)

Construction Inspection

Total

318,133.03 $