Practical Application of the Complete Streets Guide
Based on priority elements shown below in Figure 7-18, the typology calls for narrower travel lanes, a shared use path on both sides (preferred) and buffered/landscaped separation of pedestrian and bicycle facilities from the travel lanes. It also calls for a target speed of 25-35 MPH.
Figure 7-18 Typology Suburban Neighborhood Connector
STREET CHARACTERISTICS: SYMMES ROAD CORRIDOR For this application of the Complete Streets Guide, three locations were selected along Symmes Road: the intersection with US 41, the intersection with Violet Orchid Place, and the intersection with North Street as shown in Figure 7-19. These locations on the Symmes Road corridor were selected because they exhibit right-of-way restrictions, environmental, and utility conflicts.
Figure 7-19 Symmes Road Corridor