7
6-1 COMPARISON OF MAIN STREET, C4 WITH & WITHOUT CENTER MEDIAN BRT LANES 6-2 COMPARISON OF REGIONAL COMMERCIAL, C3C WITH & WITHOUT TRANSIT (BAT) LANES
143 143 148 149 150 151 153 154 155 156 157 158 159 160 161 162 163 163 164 165 165 167 168 169 170 170 171 172 173 173 174 175
7-1 BUILT FORM: SOUTH 78 TH STREET
7-2 TYPOLOGY SECTION FOR SOUTH 78 TH STREET
7-3 MAIN STREET AND URBAN NEIGHBORHOOD TYPOLOGIES
7-4 SOUTH 78TH STREET CORRIDOR
7-5 CURRENT CONDITIONS: TIDEWATER TRAIL 7-6 PROPOSED DESIGN ELEMENTS: TIDEWATER TRAIL 7-7 PROPOSED CONDITIONS PLAN VIEW: TIDEWATER TRAIL 7-8 PROPOSED CONDITIONS RENDERING: TIDEWATER TRAIL 7-9 CURRENT CONDITIONS: CLAIR MEL SCHOOL 7-10 PROPOSED DESIGN ELEMENTS: CLAIR MEL SCHOOL 7-11 PROPOSED CONDITIONS PLAN VIEW: CLAIR MEL SCHOOL 7-12 PROPOSED CONDITIONS RENDERING: CLAIR MEL SCHOOL
7-13 CURRENT CONDITIONS: PALM RIVER ROAD
7-14 PROPOSED CONDITIONS PLAN VIEW: PALM RIVER ROAD 7-15 PROPOSED CONDITIONS RENDERING: PALM RIVER ROAD
7-16 BUILT FORM: SYMMES ROAD
7-17 TYPOLOGY SELECTION PROCESS FOR SYMMES ROAD 7-18 TYPOLOGY SUBURBAN NEIGHBORHOOD CONNECTOR
7-19 SYMMES ROAD CORRIDOR
7-20 CURRENT CONDITIONS: HIGHWAY 41
7-21 FIGURE 7-21 PROPOSED CONDITIONS PLAN VIEW: US HIGHWAY 41 7-22 PROPOSED CONDITIONS RENDERING: US HIGHWAY 41
7-23 CURRENT CONDITIONS: VIOLET ORCHARD PLACE
7-24 PROPOSED CONDITIONS PLAN VIEW: VIOLET ORCHARD PLACE 7-25 PROPOSED DESIGN ELEMENTS: VIOLET ORCHARD PLACE 7-26 PROPOSED CONDITIONS RENDERING: VIOLET ORCHARD PLACE
7-27 CURRENT CONDITIONS: NORTH STREET
7-28 PROPOSED CONDITIONS PLAN VIEW: NORTH STREET 7-29 PROPOSED DESIGN ELEMENTS: NORTH STREET 7-30 PROPOSED CONDITIONS RENDERING: NORTH STREET
Made with FlippingBook Learn more on our blog