MOVE IN

PERMITTING & G.C. SELECTION

CONSTRUCTION DOCUMENTS

CONSTRUCTION ADMINISTRATION

POST OCCUPANCY FEEDBACK

G.C. BID REVIEW

We pride ourselves on delivering on-time, on- budget, and with “no surprises.” Using tools such as Revit allows us to provide clients with 3-D views from the very early stages of the project so you won’t have to try to interpret flat representations of your space. And, GF will develop different scenarios to make the way to proceed more clear. GF engages in an inward-facing value engineering throughout the design process. We understand that opportunities for cost savings and schedule management are greatest in the early stages of the project and diminish as work progresses. As a result, emphasis is placed on controlling these aspects during the schematic design and design development phases of a project. At these stages, factors that may adversely affect the cost of a design can be identified and alternative action taken, if necessary.

Cost control and time management are fundamental and continually

the process. GF remains fully engaged at this stage, ensuring

that everything reflected in the construction documents is built to specifications. GF remains highly involved throughout construction administration, advocating for our client and making sure their needs are met. During move in and even post-occupancy, GF provides customer service as needed, perfecting the design, and gathering feedback to make adjustments, as necessary. Our work does not end when the punch list is completed. We’ll be there to assure design, functionality, branding, fit, and finish meet or exceed expectations. Because when all is said and done, it comes down to caring.

monitored. We include value-priced alternatives as we develop the palette. We’re also careful to seek out solutions that will not be bogged down in supply-chain bottlenecks. We want you to “spend wisely” – in your budget and in your schedule. As we develop construction documents, we engage the client in “page turn” sessions. These sessions are high-level but in sufficient depth and detail to be sure that the needs of the project are being met. During this phase GF gathers bids from general contractors, evaluates the proposals submitted, and provides recommendations on general contractor selection. Construction administration is a critical phase of