GWO Lift Commission, Inspection, Installation and Maintenance Training Standard V0
2021-09-30_TS_LCIIM_V0
7.2
Top obstruction flashing light
7.3
Top obstruction in top position
Total
45 min.
8 Bottom obstruction device 8.1
Bottom obstruction device function
8.2
Bowden cable
8.3
Bottom obstruction flashing light
8.4
Bottom obstruction device stop in the lowest position
Total
72 min.
9 Lift door lock / electrical inter-lock
9.1
Function test of the door lock
9.2
Emergency unlocking
9.3
Upper and lower hatches
Total
20 min.
10 Lift operation/manoeuvre panel (LOP)
10.1
The lift operation/ manoeuvre panel
10.2
Operation hour counter
10.3
Emergency rescue system
Total
20 min.
11 Suspension/crossbeam
11.1
Suspension/crossbeam
11.2
Rope end attachments
11.3
Bolts and bolts connections
11.4
Upper and lower attack pinion
Total
35 min.
12 Drive and safety wire rope 12.1
Drive ropes, in general
12.2
Tension weights
12.3
Grounding rotating unit
12.4
Rope ends
Global Wind Organisation www.globalwindsafety.org
21 / 71
Made with FlippingBook Ebook Creator