Table G-6: Planned roadway projects
Project Numbe r
Extent 1 (South or West)
Extent 2 (North or East)
Type (Primary)
Type (Secondary)
Agency(ies )
Project Name
Source
Status
Description
Two-way conversion of Pine Street from Peachtree Street to Courtland, along with streetscaping. Both GDOT and ADID have studied modifications to the Williams Street interchange with the Connector to facilitate efficient movement of vehicles on and off the Interstate and to provide new access points to the Interstates. The improvements studied by GDOT are part of a larger group of improvements originating from their Downtown Connector Study. Implement two-way operations on Baker Street between Centennial Olympic Park Drive and Piedmont Avenue. In anticipation of resurfacing work, ADID is currently exploring possible lane reconfigurations along Forsyth Street to improve the corridor for all users. The pavement condition of Ivan Allen Jr Blvd, between Peachtree Street and West Peachtree Street has deteriorated beyond the useful life and traveling the pavement surface is unsafe and unpleasant.
Pine St Two-way Conversion
Peachtree St
Courtland St
ADID, ATLDOT
54
Roadway
Pedestrian
Stitch Phase 1
Planned
Williams Street interchang e
Williams Street Interchange Modifications
Downtown Connector Study
GDOT, ADID
55
Roadway
N/A
N/A
Planned
Centennial Olympic Park Dr
Downtown Atlanta Master Plan
Baker Street Two- way Conversion
Piedmont Ave
56
Roadway
N/A
ADID
Planned
Forsyth Street Enhancements
Memorial Dr
Peachtree St
ADID & City of Atlanta
ADID Captial Projects
57
Roadway
N/A
Design
W Peachtree St
Ivan Allen Jr. Repaving
Peachtree St
Downtown Decides!
58
Roadway
N/A
ADID
Planned
G-24