The Stitch Master Plan Appendices 1&2

Table G-6: Planned roadway projects

Project Numbe r

Extent 1 (South or West)

Extent 2 (North or East)

Type (Primary)

Type (Secondary)

Agency(ies )

Project Name

Source

Status

Description

Two-way conversion of Pine Street from Peachtree Street to Courtland, along with streetscaping. Both GDOT and ADID have studied modifications to the Williams Street interchange with the Connector to facilitate efficient movement of vehicles on and off the Interstate and to provide new access points to the Interstates. The improvements studied by GDOT are part of a larger group of improvements originating from their Downtown Connector Study. Implement two-way operations on Baker Street between Centennial Olympic Park Drive and Piedmont Avenue. In anticipation of resurfacing work, ADID is currently exploring possible lane reconfigurations along Forsyth Street to improve the corridor for all users. The pavement condition of Ivan Allen Jr Blvd, between Peachtree Street and West Peachtree Street has deteriorated beyond the useful life and traveling the pavement surface is unsafe and unpleasant.

Pine St Two-way Conversion

Peachtree St

Courtland St

ADID, ATLDOT

54

Roadway

Pedestrian

Stitch Phase 1

Planned

Williams Street interchang e

Williams Street Interchange Modifications

Downtown Connector Study

GDOT, ADID

55

Roadway

N/A

N/A

Planned

Centennial Olympic Park Dr

Downtown Atlanta Master Plan

Baker Street Two- way Conversion

Piedmont Ave

56

Roadway

N/A

ADID

Planned

Forsyth Street Enhancements

Memorial Dr

Peachtree St

ADID & City of Atlanta

ADID Captial Projects

57

Roadway

N/A

Design

W Peachtree St

Ivan Allen Jr. Repaving

Peachtree St

Downtown Decides!

58

Roadway

N/A

ADID

Planned