Project Numbe r
Extent 1 (South or West)
Extent 2 (North or East)
Type (Primary)
Type (Secondary)
Agency(ies )
Project Name
Source
Status
Description
Includes the replacement of traffic signal cabinets, minor signal upgrades, controllers, signal wiring, ADA ramps, fiber installation, and signal timing at multiple intersections. Locations include: 14th St, Courtland Ave, Juniper St, Linden Ave, Monroe Dr at Park Dr, Monroe Dr, Pine St, Ponce De Leon Ave, Spring St, Ted Turner Dr signal, W Peachtree St, Juniper St, Roxboro Rd, Monroe Dr, 10th St, Northside Dr at Marietta St, and Piedmont Ave. Mount Paran Rd at Northside Pkwy scope also includes intersection improvements. This project includes signal enhancements at intersections on Greenbriar Pkwy, Sylvan Rd, 10th St, State St and North Ave. The signal enhancements include but not limited marking improvements, ADA ramps, 4G or Fiber traffic communications installation and signal timing optimization to reduce over all corridor delay and improve progression. to signal equipment upgrades, detection upgrades, pavement
Citywide ITS/Signal
Various locations
ATL DOT Projects
59
Roadway
Pedestrian
N/A
ATL DOT
Design
Atlanta Traffic Signal Enhancement Program (Various
Marietta St NW
Central Park Pl
60
Roadway
Pedestrian
ATLDOT
ARC RTP
Planned
Intersections along North Avenue)
G-25
Made with FlippingBook Ebook Creator