The Stitch Master Plan Appendices 1&2

Project Numbe r

Extent 1 (South or West)

Extent 2 (North or East)

Type (Primary)

Type (Secondary)

Agency(ies )

Project Name

Source

Status

Description

This project aims to improve access to the area of Midtown between 10th Street and North Avenue and lessen traffic volume on North Avenue. The project calls for the installation of a new ramp and bridge adjacent to the existing North Ave bridge that would allow southbound highway drivers bound for the east side of the Connector in Midtown to avoid North Avenue traffic and make a free U-turn over the Interstate and connect directly to Williams Street. Williams Street would be extended from its current terminus at 4th Street. Given the scope and scale of this project, additional study needs to be completed to better understand the impacts that this would have on the district. Incrementally convert to two-way and enhance pedestrian experience as a signature/gateway for both east downtown and GWCC area. Phase 1, convert east of Peachtree. Phase 2, convert west of Peachtree Convert to two-way, use excess right of way to enhance pedestrian experience and provide on-street parking where applicable. Enhance environment to include improving landscaping, sidewalks, lighting, and paint consistent with the Connector Transformation plan.

North Avenue Alternative Freeway Access and Corridor Enhancement

North Ave interchang e

Midtown Transportation Plan

Midtown Alliance

61

Roadway

N/A

N/A

Planned

Andrew Young International Boulevard Two- Way Conversion & Pedestrian Enhancements

Downtown Atlanta Transportation Plan Downtown Atlanta Transportation Plan Downtown Atlanta Transportation Plan

Ted Turner Dr

Piedmont Ave

62

Roadway

Pedestrian

ADID

Planned

Ellis Street Two- Way Conversion

Peachtree St

Piedmont Ave

63

Roadway

Pedestrian

ADID

Planned

Freedom Parkway Interstate Reconfiguration

64

Roadway

Pedestrian

I-75/85

Boulevard

ADID

Planned

G-26