DOCUMENT
PLAN OVERVIEW
KEY STUDY AREA TAKEAWAYS
Downtown Connector Original Construction Plans (1950)
GDOT Construction Plans consisting of Plans, profiles, cross sections and bridge drawings
• Provides details about existing and proposed conditions
Downtown Connector Original ROW Plans (1951)
• Provides details about the Existing and Proposed ROW
GDOT ROW Plans
Spring-West Peachtree Construction Plans (1979) Downtown connector - Piedmont Avenue to Spring Street (1983)
GDOT Construction Plans - Plan and Profile drawings for Spring-West Peachtree
• Provides details for Spring-West Peachtree construction
GDOT Construction Plans - Plan and Profile drawings- Downtown connector - Piedmont Avenue to Spring Street
• Provides details about the widening plans for Piedmont Avenue to Spring Street
GDOT ROW Plans - I-75 from Memorial Dr. to Spring Street (1984)
GDOT ROW Plans - I-75 from Memorial Dr. to Spring St
• Provides details about the existing and proposed ROW
• Introduces a potential redesign of the Williams Street interchange, which could impact the bridges, entrance ramps, and exit ramps at the northwest of the Stitch. • Introduces concepts for redeveloping the Downtown Connector around the Grady Curve, including tunnels and elevated sections. • Introduces concepts for High- Occupancy Toll lanes on the Downtown Connector.
GDOT Downtown Connector Corridor Study
An investigation into strategies to improve future operations of the Downtown Connector.
H-11
Made with FlippingBook Ebook Creator