The Stitch Master Plan Appendices 1&2

DOCUMENT

PLAN OVERVIEW

KEY STUDY AREA TAKEAWAYS

Downtown Connector Original Construction Plans (1950)

GDOT Construction Plans consisting of Plans, profiles, cross sections and bridge drawings

• Provides details about existing and proposed conditions

Downtown Connector Original ROW Plans (1951)

• Provides details about the Existing and Proposed ROW

GDOT ROW Plans

Spring-West Peachtree Construction Plans (1979) Downtown connector - Piedmont Avenue to Spring Street (1983)

GDOT Construction Plans - Plan and Profile drawings for Spring-West Peachtree

• Provides details for Spring-West Peachtree construction

GDOT Construction Plans - Plan and Profile drawings- Downtown connector - Piedmont Avenue to Spring Street

• Provides details about the widening plans for Piedmont Avenue to Spring Street

GDOT ROW Plans - I-75 from Memorial Dr. to Spring Street (1984)

GDOT ROW Plans - I-75 from Memorial Dr. to Spring St

• Provides details about the existing and proposed ROW

• Introduces a potential redesign of the Williams Street interchange, which could impact the bridges, entrance ramps, and exit ramps at the northwest of the Stitch. • Introduces concepts for redeveloping the Downtown Connector around the Grady Curve, including tunnels and elevated sections. • Introduces concepts for High- Occupancy Toll lanes on the Downtown Connector.

GDOT Downtown Connector Corridor Study

An investigation into strategies to improve future operations of the Downtown Connector.

H-11

Made with FlippingBook Ebook Creator