SCENARIO 2 SCENARIO 2: SSD BOUNDARY
The boundary captures parcels within a half mile of the Stitch. This boundary adds additional parcels to Scenario 1 (Scenario 1 has the same boundary as the previous 2018 SSD analysis). In the 2018 analysis, the primary use of the SSD was to fund the capital stack through bonds. In this current analysis, the SSD is primarily to fund O&M as Phase 1 funding for the Stitch is already secured.
Figure K.15 : SSD Boundary (Scenario 2)
K-19