The Stitch Master Plan Appendices 1&2

• Atlanta’s population size is comparable to Dallas, Houston, Washington DC, and Philadelphia • While ranked high, the potential for intensive park use is unlikely to be as high as New York, Los Angeles, or Chicago • Catalytic effort is required with few existing draws (the park lifts neighborhoods which in turn lifts the park)

• Higher expectations (better care & great experiences)

• Community preference for not overly commercialized experience

• Constrained location (narrow, limited access, on-structure)

Figure K.24: Park O&M Analysis

Phase 1

Heart of the Park

Higher intensity of use

• Higher expectations as first project

• Larger proportion of buildings, fountains & hardscape

• 55 percent on structure 45 percent on grade

• Extra cost if existing bridges are retained

• Earned income potential from concession & rentals Phase 2

K-35

Made with FlippingBook Ebook Creator