Corona Expansion - Arlington, TX This 42,000 SF project is a complete build out of the existing data center, in multiple phases. All work was completed while the facility was operational. The work consisted of redundant electrical services, new phase C&D electrical distribution gear, three 2,500 KW generators with fuel systems, fire suppression systems, fire alarm systems, DX CRAC units for each phase buildout, DC Power Plants for each phase, power to floor equipment via buss duct and power inverters, as well as cosmetic upgrades to paint and flooring. The project duration was 24 months.