GSW Construction Jobs

Poplar at Golf Course Trash Capture Project

The Poplar at Golf Course Trash Capture Project is a part of the City’s plan to achieve compliance with the San Francisco Bay Regional Water Quality Control Board’s (RWQCB) Municipal Regional Stormwater Permit. The permit requires reduction of trash and litter, relative to 2009 baseline values, by 90% by June 20, 2023 and by 100% by June 30, 2025. The Project consists of installing four full-capture screen devices within an existing concrete-lined storm drainage channel adjacent to the Poplar Creek Golf Course.

www.gswconstruction.com

Made with FlippingBook Digital Proposal Creator