Cabinet Specifications
Code. C. PERFORMANCE:
1. Maximum Line Pressures: Laboratory Ball Valves (Gas and Air)…..75 PSI Needle Point Cocks (Gas and Air) ..…...65 PSI Vacuum…………………………………............28.5” Mercury Hot and Cold Water……………………........80 PSI Steam……………………………………............30 PSI 2. Sepia Bronze Finish Performance:
Finish shall show no rupture, other than a slight discoloration or possible softening when subjected to the following fumes for approximately six (6) days: Plastic coated fittings shall be suspended in a container, 6 cu. ft. capacity 12” above open beakers, each containing 199 cc. of 70% Nitric Acid, 94% Sulphuric Acid, 37-38% Hydrochloric Acid, respectively. Finish shall also withstand direct contact of reagents dropped from a burette at a rate of 60 drops/min. for a period of 10 minutes. Chemicals are shown below: Concentrated Hydrochloric Acid 37-38%*
Concentrated Nitric Acid 70%* Concentrated Sulphuric Acid 94% Glacial Acetic Acid 99.5%* Ethyl and Other Alcohols Toluene and Other Hydrocarbons Carbon - Tetrachloride Mineral Oil *Percentages are by weight.
PART 3 EXECUTION 3.01 SITE EXAMINATION
A. The owner and/or his representative shall assure all building conditions conducive to the installation of a finished goods product; all critical dimensions and conditions previously checked have been adhered to by other contractors (general, mechanical, electrical, etc.) to assure a quality installation. B. Site conditions shall be in compliance with AWS Edition 1, Section 2. 3.02 INSTALLATION A. Installer: Installer shall be certified by the factory as having the necessary skills and equipment to install the casework so as not to void the warranty. B. Installation shall be to the standards set forth in SEFA 2 -2010 Installation C. Preparation: Prior to beginning installation of casework, check and verify that no irregularities exist that would affect quality of execution of work specified. D. Coordination: Coordinate the work of the Section with the schedule and other requirements of other work being performed in the area at the same time both with regard to mechanical and electrical connections to and in the fume hoods and the general construction work. E. Performance: 1. Casework: a. Set casework components plumb, square, and straight with no distortion and securely anchor to building structure. Shim as required using concealed shims.
12 35 53.19 Wood Laboratory Casework