Complete Arch Manual

Cabinet Specifications

Cabinet Specifications

PART 3 EXECUTION 3.01 SITE EXAMINATION

COMPLIANCE STATEMENT – SECTION 12 35 53.19

A. The owner and/or his representative shall assure all building conditions conducive to the installation of a finished goods product; all critical dimensions and conditions previously checked have been adhered to by other contractors (general, mechanical, electrical, etc.) to assure a quality installation. B. Site conditions shall be in compliance with AWS Edition 1, Section 2. 3.02 INSTALLATION A. Installer: Installer shall be certified by the factory as having the necessary skills and equipment to install the casework so as not to void the warranty. B. Installation shall be to the standards set forth in SEFA 2 -2010 Installation C. Preparation: Prior to beginning installation of casework, check and verify that no irregularities exist that would affect quality of execution of work specified. D. Coordination: Coordinate the work of the Section with the schedule and other requirements of other work being performed in the area at the same time both with regard to mechanical and electrical connections to and in the fume hoods and the general construction work. E. Performance: 1. Casework: a. Set casework components plumb, square, and straight with no distortion and securely anchor to building structure. Shim as required using concealed shims. b. Screw continuous cabinets together with joints flush, tight and uniform, and with alignment of adjacent units within 1/16” tolerance. c. Secure wall cabinets to solid supporting material, not to plaster, lath or gypsum board. d. Abut top edge surfaces in one true plane. Provide flush joints not to exceed 1/8” between top units. 2. Work surfaces: a. Where required due to field conditions, scribe to abutting surfaces. b. Only factory prepared field joints, located per approved shop drawings, shall be permitted. Secure the joints in the field, where practical, in the same manner as in the factory. c. Secure work surfaces to casework and equipment components with materials and procedures recommended by the manufacturer. 3. Adjust and Clean: a. Repair or remove and replace defective work, as directed by owner and/or his representative upon completion of installation. b. Adjust doors, drawers and other moving or operating parts to function smoothly. c. Clean shop finished casework; touch up as required. d. Clean work surfaces and leave them free of all grease and streaks. e. Casework to be left broom clean and orderly. F. Protection: 1. Provide reasonable protective measures to prevent casework and equipment from being exposed to other construction activity. 2. Advise owner and/or his representative of procedures and precautions for protection of material, installed laboratory casework, and fixtures from damage by work of other trades.

Project: Bidding Company: INSTRUCTIONS:

This Compliance Statement is to ensure all bids are comparable products and meet specifications. Initial each item in appropriate column and sign at bottom. Submit completed statement with bid. Non-compliance and lack of completed Compliance Statement are cause for dismissal of bid.

YES

NO

1.

Lifetime warranty

2.

Mechanical fastening at front toe base

3. AWI Premium hardwood dowel cabinet joinery - 64mm on center

4.

MAS® or GreenGuard® Certified

5. HPVA Grade A-1 plain-sliced veneers, vertically matched

6.

Independently tested to SEFA 8W

7.

Stainless steel five-knuckle institutional hinges

8.

Screws strips at top and bottom of wall cabinets

9. Chemical-resistant finish meets AWI standards and is applied to parts prior to assembly via a flat line, roller applied system 10. Chemical-resistant finish meets SEFA standards and is VOC-free

11. Cabinets will be foam and shrink-wrapped, not blanket wrapped

Our bid is for cabinets built per this compliance statement and the specifications as written.

Officer of the Bidding Company:

Signature

Printed

Title

Date

END OF SECTION

12 35 53.19 Wood Laboratory Casework

12 35 53.19 Wood Laboratory Casework

80

DiversifiedCasework.com | info@DiversifiedCasework.com | 877.348.9663

DiversifiedCasework.com | info@DiversifiedCasework.com | 877.348.9663

81

Made with FlippingBook interactive PDF creator