Fire Chief FC2500 Furnace Operator Manual

5.3 Installation of the assembled plenum on the furnace Identify the left side of the plenum, it is provided with holes for the installation of the “RTD” thermal probe.

Also, 5 holes are aligned with the fold of the top of the furnace on the left side and three holes on the other sides. This allows you to secure the plenum properly.

Install the assembly on the furnace, taking care to insert the 4 folds on top of the furnace inside the plenum.

Using 14 screws (C) , secure the plenum to the furnace.

Made with FlippingBook - professional solution for displaying marketing and sales documents online