Fire Chief FC2500 Furnace Operator Manual

FC2500 Furnace Installation and Operation Manual

9.3.1 Cold start and cold ember bed (The led button light is OFF) • Press reload button before opening the door

• Place paper and kindling on top of the ash grate

• Place two logs

North&South on each side of the kindling

• Place another row in a crisscross pattern on top of the first logs.

• Light the paper and leave the door ajar (45 degree). Wait until the kindling and the logs catch fire. Then close the door. • Important: never leave unattended the furnace with the door opened.

51

Made with FlippingBook - professional solution for displaying marketing and sales documents online