Project Profile_Ocean Street Carlsbad_3-26-19_v2

PROJECT PROFILE | CARLSBAD, CA Beach Access Beautification Complies Despite Tough Permits Modular Wetlands® Systems

MODULAR WETLANDS® SYSTEM ADVANTAGES

With or without plants (open planter or sealed), the system maintains superior performance in any design configuration.

WA TAPE GULD Approval Without Plants

The Modular Wetlands ® System Linear

Piping into the system opens up numerous configuration and design options, like downstream of detention usage or diverting for retrofits. The easily accessible pretreatment chamber traps and isolates trash, sediments, and hydrocarbons. A unique feature, proven to keep maintenance frequencies & costs at industry-leading lows.

Can Accept Existing Pipe Below Surface

Works Months Without Requiring Maintenance

The Side-By-Side Orientation option allows abnormal high flows to bypass from pretreatment directly to the discharge chamber.

Can Accommodate High Flow Internal Bypass

Space-saving design provides low excavation and installation costs, plus there is no dangerous depressed planter or standing water.

Design Flexibility & Safety

Side-by-Side Orientation

CONTACT INFORMATION Regional Stormwater Consultant for San Diego

Sean Hasan San Diego & Riverside Counties | Phone: (760) 473-1057 | Email: Sean.Hasan@Forterrabp.com

5796 Armada Drive #250, Carlsbad, CA | 855.566.3938 | stormwater@forterrabp.com | www.biocleanenvironmental.com

Made with FlippingBook - professional solution for displaying marketing and sales documents online