The Errigal team worked on a live site where residents had moved into apartments whilst others were still under construction. This has meant keeping lines of communication open with residents and being considerate to those who are at home more than often during a pandemic and therefore exposed to more disruption. The proximity of the apartments to the flight paths of London City Airport required acoustic parameters to be implemented. The apartments were also in short distance to the London Underground, which meant that communication and comprehensive forward planning was crucial to facilitate the works without interrupting schedules.
THE JOB IN NUMBERS
700m2 GRC/Petrarch Cladding. 1,500m GRC Feature Reveals. 45,000m PPC Aluminium and Stainless Steel Copings, Flashings, Facia Panels, Spandrel Panels, Soffits. 5,000m Glass and Metal Balustrades. 3,500m Rainwater Pipes. 55,000m2 of through wall construction including SFS, board, insulation, membranes and fire barriers. 50,000m2 Gebrik Brick Slip Cladding. 5,000m2 PPC Aluminium Rainscreen Cladding. 20,000m2 Window Install.
1,000m2 Curtain Wall. 2,500m Stone Banding.
Contract Value - £53m
2020
2021
Made with FlippingBook - Online catalogs