AcoustIQ Install Instructions

Care and Maintenance

Installation

Step 1: Each panel has a back and front side, the back side has a rough finish & front side has a smooth finish. Ensure you are installing it correctly. Step 2: Cut to desired size Step 3: Apply adhesive to the back of the first panel as per manufacturer’s instructions/specifications. Ensure all edges are square.

Step 4: Place first panel with edge contact first following with the other half. Step 5: Ensure you have pressed it down flat with clean hands with no air pockets between the surfaces.

Regular Care

Protect from direct heat and sunlight.

• Do not scrub or abrade the panel as this will affect the surface finish. • Once the stain or mark has been loosened then blot the excess solution out with a dry clean cloth. • Sponge afterwards with clean warm water and mop any excess moisture with a dry clean sponge or cloth. • The panel can also be spot cleaned with dry cleaning fluid. Lightly sponge a small amount of dry cleaning fluid and blot. • Dry away from direct head and sunlight. • Avoid the use of carpet shampoos.

• To prevent dust build up, lightly dust with a soft cloth or vacuum with a soft brush attachment. Spot Cleaning • Professional cleaning is always recommended. • Always test any cleaning products on an inconspicuous are prior to commencing cleaning. • Blot any excess spills from the material with a dry clean sponge or cloth. • Treat all stains as soon as possible. • Most marks can be spot cleaned by lightly wetting the affected area with a mild detergent and warm water solution. • Do not saturate the panel, screen or felt.

E

R

olgoffice.com | myolg.online

Made with FlippingBook - Share PDF online