Sime Darby Plantation

BRILLIANT TECH for

FREE POWER

1. Top tank water is released through the 35 degrees angle pipe down. 2. The water reaches Pelton turbine. 3. Pelton spins the generator. 4. The water from the Pelton turbine falls and passes through 4 sets of Pryter Impeller. 5. The water then sucks by the pump and pushes to the top tank via the 90 degrees pipe. 6. The water reaches the top tank. 7. Restart process no. 1

The energy produced will charge the storage system, and power released upon request.

Made with FlippingBook - professional solution for displaying marketing and sales documents online