October 19, 2020 Directors Report

YEAR TWO - 2022 OPTION 2

Year Road Name

Width Length

Area PCC Repairs AC Repairs Surface Treatment

Cost

2 Club House DW Back

20 30 19 19 19 19 19 19 19 19 19

195

3,900

Seal Coat Seal Coat Seal Coat Seal Coat Seal Coat Seal Coat Seal Coat Seal Coat Seal Coat Seal Coat Seal Coat

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

858.00

2 Golf Course Dr 2 Golf Course Cir 2 Boxwood Dr

4,800

144,000

300

2,000

56,680.00 2,472.36 2,138.40 3,144.46

427 380 522 122 240 522 380 380 376

8,113 7,220 9,918 2,318 4,560 9,918 7,220 7,220 7,144

250 200 350 200 350 200 200 200

2 Fig Dr

2 Cocoplum Parking 2 Cocoplum Ln 2 Washatonia Dr

509.96

1,553.20 3,144.46 2,138.40 2,138.40 2,121.68 5,000.00 81,899.32 4,500.00 6,500.00 92,899.32

2 Guava Dr

2 Scarletbush Dr 2 Princewood Dr

Misc. Costs

Total

Engineering (PSE)

Construction Inspection

Total

OPTION 2

YEAR THREE - 2023

Year Road Name 3 Sunrise Cir 3 Sunrise Cir 3 Oleander Dr

Width Length

Area PCC Repairs AC Repairs Surface Treatment

Cost

19 20 19 19 19 19

1,834

34,846 15,100

3,668 1,510 1,036

1,500

Seal Coat AC Overlay Seal Coat Seal Coat Seal Coat Seal Coat

140,171.12 $

755 518

500 750

$ $ $

57,547.00 40,487.74

9,842

3 Oleander Dr Parking

51

969

213.18

3 Primrose Cir 3 Cactus Ln

1,330

25,270

2,660

750 500

100,721.90 $

200

3,800

400

$ $

16,211.00 40,000.00

Misc. Costs

Total 395,351.94 $ Inflation 15,814.08 $

Engineering (PSE) $ Construction Inspection 30,000.00 $ Total 448,666.02 $ 7,500.00