YEAR SIX - 2026 OPTION 2
Year Road Name
Width Length
Area PCC Repairs AC Repairs Surface Treatment
Cost
6 Sunset Dr
19 19 19 19 42 75
1,302
24,738 10,450
2,604 1,100
750 750 500
Seal Coat Seal Coat Seal Coat Seal Coat Seal Coat Seal Coat
$ $ $ $ $ $ $
98,644.86 42,861.50 19,029.84
6 Periwinkle Dr 6 Orange Tree Ln
550 238
4,522
476
6 Orange Tree Ln Parking
45
855
188.10
6 Palm Blvd
383 295
16,086 22,125
200
750
18,601.42 11,742.50 35,000.00
6 Palm Blvd Parking Lot
2,500
Misc. Costs
Total 226,068.22 $ Inflation 22,606.82 $
Engineering (PSE) $ Construction Inspection 25,000.00 $ Total 281,175.04 $ 7,500.00
Six Year PMP Total
1,783,439.04 $
Made with FlippingBook - Online Brochure Maker