October 19, 2020 Directors Report

YEAR SIX - 2026 OPTION 2

Year Road Name

Width Length

Area PCC Repairs AC Repairs Surface Treatment

Cost

6 Sunset Dr

19 19 19 19 42 75

1,302

24,738 10,450

2,604 1,100

750 750 500

Seal Coat Seal Coat Seal Coat Seal Coat Seal Coat Seal Coat

$ $ $ $ $ $ $

98,644.86 42,861.50 19,029.84

6 Periwinkle Dr 6 Orange Tree Ln

550 238

4,522

476

6 Orange Tree Ln Parking

45

855

188.10

6 Palm Blvd

383 295

16,086 22,125

200

750

18,601.42 11,742.50 35,000.00

6 Palm Blvd Parking Lot

2,500

Misc. Costs

Total 226,068.22 $ Inflation 22,606.82 $

Engineering (PSE) $ Construction Inspection 25,000.00 $ Total 281,175.04 $ 7,500.00

Six Year PMP Total

1,783,439.04 $

Made with FlippingBook - Online Brochure Maker