FLAT ROOF ALL DONE IN ONE DAY 5. Hot Mop Waterproofing System Hot Mop Application #1: Hot asphalt is applied to bond layers together Install 1 ply RUBEROID 20 Smooth Membrane (synthetic ply sheet) Hot Mop Application #2: A second layer of hot asphalt is applied Install 1 ply Mineral Cap Sheet, hot-mopped into place Apply granules for added durability, UV protection, and weather resistance This creates the main waterproofing layer of the flat roof system. 6. Flashings & Details Seal around all edges, walls, pipes, AC stands, and equipment Install all necessary flashing to ensure complete waterproofing and proper drainage 7. Final Walk-Through Perform a full inspection to confirm proper adhesion and sealing Clean the entire jobsite and remove all debris
Made with FlippingBook Digital Proposal Creator