MARYLAND TRANSPORTATION AUTHORITY -- Line 14
Primary Construction Program
PROJECT: I-695 Francis Scott Key Bridge - Key Bridge Rebuild
DESCRIPTION: This project will replace the Francis Scott Key Bridge and approaches using a Progressive Design-Build procurement process. The project is expected to be funded from insurance and FHWA emergency relief proceeds. Regionally, the Key Bridge played a critical role in the transportation network, including the transport of goods to and from the Port of Baltimore, the nation’s largest port facility for specialized cargo and passenger facilities, and nearby distribution centers such as Tradepoint Atlantic at Sparrows Point. On 12/21/24, Congress approved the full federal funding of the Key Bridge Replacement Project’s eligible costs. The MDTA will use toll revenue to fund the up front costs of the Key Bridge reconstruction, with Federal reimbursement in the future.
PURPOSE & NEED SUMMARY STATEMENT: On March 26, 2024, a cargo container vessel struck a main pier of the Francis Scott Key Bridge while transiting out of the Baltimore Harbor. The impact caused the bridge to collapse into the Patapsco River within seconds of the allision. As a result, the I- 695 highway and ship channel became impassable. The loss of the Francis Scott Key Bridge significantly impacts travel in the Baltimore Metropolitan Region. The preliminary design phase is being delivered using an aggressive schedule, so construction can commence as soon as possible.
STATE GOALS : Maryland Transportation Plan (MTP) Goals/Selection Criteria: X X Enhance Safety and Security Deliver System Quality
X X Serve Communities and Support the Economy Promote Environmental Stewardship
X
SMART GROWTH STATUS:
Project Not Location Specific
Not Subject to PFA Law
Project Inside PFA Project Outside PFA
Grandfathered
Exception Will Be Required
EXPLANATION: Replacing the Francis Scott Key Bridge will restore critically affected traffic patterns in the Baltimore Metropolitan Region. It is a critical link in the regional and interstate transportation network and was the primary interstate route for hazardous material loads traveling through Baltimore. The collapse has negatively impacted community mobility and connectivity by creating a major gap in the Baltimore transportation network for both local and regional traffic.
PFA Status Yet to Be Determined
Exception Granted
STATUS: Planning, engineering and construction are underway.
SPECIAL
FEDERAL
OTHER
X
GENERAL
POTENTIAL FUNDING SOURCE:
TOTAL
SIGNIFICANT CHANGE FROM FY 2025 - 30 CTP: Cost increased by $3.4 billion due to detailed design development and refinement, as well as detailed cost estimating efforts. Previous cost estimates were developed for programming purposes shortly after the Key Bridge collapse.
CURRENT YEAR 2026 1,733 115,325
BUDGET YEAR 2027
PLANNING FOR PLANNING PURPOSES ONLY
SIX YEAR TOTAL
BALANCE TO COMPLETE
PHASE
ESTIMATED EXPENDED COST THRU ($000) CLOSE YEAR
PREVIOUS YEAR 2025 91 77,742
...2028... ...2029...
...2030...
...2031...
0 0 0 0
1,733 115,325
Planning
2,000
267
0
0
0
0
0 0 0 0
Engineering
193,179
77,854
0
0
0
0
0 0
Right-of-way
0
0
0 0 1,264 79,098 0 79,098 0
0 0
0
0
0
0
Utility
0
0
0
0
0
0
529,583 529,583 0 529,583 0
4,874,309 4,991,367 0 4,991,367 0
Construction
4,993,579
1,968
719,432 836,490 0 836,490 0
896,359 1,128,859
1,112,560
487,517
117,302 117,302 0 117,302 0
Total
5,188,758
80,088
896,359 1,128,859
1,112,560
487,517
Federal-Aid
0
0
0
0
0
0
TOLL
5,188,758
80,088
896,359 1,128,859
1,112,560
487,517
Other
0
0
0
0
0
0
2655
PAGE
MDTA--14