Consolidated Transportation Program (CTP) FY 2026 to 2031

MARYLAND TRANSPORTATION AUTHORITY -- Line 21

Primary Construction Program

PROJECT: I-895 Baltimore Harbor Tunnel Thruway - Facility-wide Signing Upgrades

DESCRIPTION: The existing signing along the BHT facility is past their service life. This project will upgrade all existing signing along the BHT facility, ensuring the facility signing is in accordance with the Maryland Manual on Uniform Traffic Control Devices (MdMUTCD). The project will also upgrade AET tolling signing as needed.

PURPOSE & NEED SUMMARY STATEMENT: This purpose of this project is to replace existing highway signs for the BHT facility that are, or will soon be, beyond their expected service life and to address new signing requirements within the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD).

STATE GOALS : Maryland Transportation Plan (MTP) Goals/Selection Criteria: X X Enhance Safety and Security Deliver System Quality

Serve Communities and Support the Economy

X

SMART GROWTH STATUS:

Project Not Location Specific

Not Subject to PFA Law

Promote Environmental Stewardship

Project Inside PFA Project Outside PFA

Grandfathered

Exception Will Be Required

EXPLANATION: Upon completion of the project, highway signing along the BHT facility will be in a state of good

PFA Status Yet to Be Determined

Exception Granted

repair and will generally meet the latest requirements of the MUTCD.

STATUS: Engineering is underway. Construction will begin in March 2026.

SPECIAL

FEDERAL

OTHER

X

GENERAL

POTENTIAL FUNDING SOURCE:

TOTAL

SIGNIFICANT CHANGE FROM FY 2025 - 30 CTP: Cost decreased by $7.5 million due to a portion of the scope was removed due to an anticipated MTA project being deferred, resulting in no longer needing to replace MDTA cantilever sign structure and infrastructure along Ponca Street.

CURRENT YEAR 2026 0 90

BUDGET YEAR 2027

PLANNING FOR PLANNING PURPOSES ONLY

SIX YEAR TOTAL

BALANCE TO COMPLETE

PHASE

ESTIMATED EXPENDED COST THRU ($000) CLOSE YEAR

PREVIOUS YEAR 2025 0 418

...2028... ...2029...

...2030...

...2031...

0 0 0 0

0 90

Planning

0

0

0

0

0

0

0 0 0 0 0 0 0 0 0

Engineering

1,175

1,085

0

0

0

0

0 0

Right-of-way

0

0

0 0 0 418 0 418 0

0 0

0

0

0

0

Utility

0

0

0

0

0

0

4,712 4,712 0 4,712 0

12,499 12,589 0 12,589 0

Construction

12,499

0

470 560 0 560 0

5,069

2,248

0

0

Total

13,674

1,085

5,069

2,248

0

0

Federal-Aid

0

0

0

0

0

0

TOLL

13,674

1,085

5,069

2,248

0

0

Other

0

0

0

0

0

0

2614

PAGE

MDTA--21

Made with FlippingBook Digital Proposal Creator