Consolidated Transportation Program (CTP) FY 2026 to 2031

MINOR PROJECTS PROGRAM (Dollars in Thousands)

MARYLAND TRANSPORTATION AUTHORITY - LINE 33 PROJECT ID PROJECT NAME

TOTAL PROGRAMMED COST

FACILITY CODE

STATUS

Signage

MDTAPRJ002625 ICC Sign Panel Replacements (Engineering Only)

ICC - INTERCOUNTY CONNECTOR

$

1,200

Design Underway

Structural Preservation

2436

Replace I-95 Kennedy Highway Bridge over CSXT (Engineering only) Replace Bridges on I-895 over I-695 (Engineering only)

KH - KENNEDY HIGHWAY HT - HARBOR TUNNEL

$

3,081

Design Underway

2527

$

2,260

Design Underway

MDTAPRJ000199 Maintenance and Repairs of the I-695 Curtis Creek Drawbridges at FSK

KB - F.S.KEY BRIDGE

$

2,541

Under Construction

Tunnel Preservation

MDTAPRJ002591 Rehabilitate Upper Plenum Liner and Ceiling (Engineering only)

HT - HARBOR TUNNEL

$

100

Design Underway

MDTAPRJ002615 Replace and Rehabilitate FMT Electrical Switchgear (Engineering only)

FT - FORT MCHENRY TUNNEL

$

1,000

Design Underway

PAGE MDTA-34

Made with FlippingBook Digital Proposal Creator