A temporary stressing design allowed for framework to be removed from the first two outer decks and to construct the central deck before stressing the whole deck as one.
AfriSam’s laboratory and plant teams coordinated effectively to ensure slump adjustments at short notice were implemented accurately.
AfriSam used 25 to 30% fly-ash mix to help control the heat of hydration and to contribute to durability.
¡ ¢ £ ¤
The large concrete pours required a coordinated effort by 60 staff at AfriSam’s three batching plants.
¢