Sammamish Unified Development Code

Development Standards | Development Standards—Parking and Circulation

I. Electric vehicle parking stations—Provisions for

Where electric vehicle charging stations are provided in parking lots or parking garages, accessible electric vehicle charging stations shall be provided as follows:

1. Accessible electric vehicle charging stations shall be provided in the ratios shown on the following table:

EV CHARGING STATION PROVISION Number of EV Charging Stations Minimum Accessible EV Charging Stations 1 - 50 1 51 - 100 2 101 - 150 3 151 - 200 4 201 - 250 5 251 - 300 6 2. Accessible electric vehicle charging stations should be located in close proximity to the building or facility entrance and shall be connected to a barrier-free accessible route of travel. It is not necessary to designate the accessible electric vehicle charging station exclusively for the use of disabled persons. Below are two options for providing for accessible electric vehicle charging stations.

J. Loading space requirements

1. Every nonresidential building engaged in retail, wholesale, manufacturing, or storage activities, excluding self-service storage facilities, shall provide loading spaces in accordance with the standards listed below:

LOADING SPACE REQUIREMENTS Gross Floor Area

Required Number of Loading Spaces

10,000 to 16,000 square feet 16,001 to 40,000 square feet 40,001 to 64,000 square feet

1

2 3

330 | Title 21: Sammamish Development Code

Effective | January 1, 2022

Made with FlippingBook Ebook Creator