surveyor within 90 days of the final lift of asphalt; and

recorded within 30 days of the original certificate or supplemental certificate date. d. All applicable processing fees specified by City fee resolution, applicable mitigation and impact fee amounts, and any civil penalty assessed pursuant to SMC Title 23 against a site being reviewed under this section shall be paid, and all required financial guarantees posted prior to recording. e. Prior to recording, all site improvements required by SDC 21.02.060E.4. shall be complete and approved by the City. Applicable performance bonds and written final approval from the applicable water/sewer district and health department shall be obtained, if required. f. A copy of protective deed covenants shall accompany the final plat or short plat, if applicable. g. Upon approval by the department, the City council shall consider the final plat at a public meeting to confirm the conformance of the final plat to the conditions of preliminary approval imposed by the hearing examiner. Upon approval, the final plat or short plat shall be recorded with the county records and elections division.

viii. Improvements without which the director determines a safety hazard would exist.

b. The City shall have right of entry onto any lot, tract, easement or parcel that is part of the final plat or short plat to ensure compliance with the minimum improvements required in subsection 1. of this section.

5. Final plat and final short plat review procedures

a. Upon the City’s inspection and determination that the site improvements required by SDC 21.02.060E.4. have been substantially completed pursuant to the approved plans, a final plat or final short plat shall be surveyed by a land surveyor and submitted to the department for review and approval. Substantial completion of site improvements, for purposes of final plat or final short plat submittal, shall mean street and lot rough grading has been completed and water, sewer, stormwater, and natural gas utilities have been installed. b. All final plats and final short plats shall demonstrate conformance to the conditions of preliminary approval in a compliance matrix, as well as Chapter 58.17 RCW and Chapter 332-130 WAC. c. Plat certificates or owner’s duplicate certificates for land registered pursuant to Chapter 65.12 RCW shall be provided to the department prior to recording. Supplemental plat certificates shall be provided to the department if the final plat or final short plat is not

6. Contents of final plat and final short plat

The final plat or short plat shall comply with the requirements of Chapter 58.17 RCW and be in a form prescribed by the department and shall include all information as described in an official application packet approved by the director.

Effective | January 1, 2022