Sammamish Unified Development Code

PublicWorksandBuildings | DevelopmentStandards—InterimStreetDesignStandards

Sammamish Development Code

C. Right-of-way use permit types

4. As part of a complete right-of-way use permit application, the applicant shall submit to the City, at the time of application, right-of-way use permit fees, including a nonrefundable application fee, as set forth in the most current City of Sammamish fee schedule. 5. If insurance is required, the insurance guidelines in City policy shall apply unless otherwise established by the City. 6. Conditions of approval will be identified during the City’s review of the application and may include a certificate of insurance, indemnification and hold harmless agreement, traffic control plan, performance bond, time and use restrictions, video data, status reports, restoration of disturbed right-of-way features, or any other requirements the City deems necessary to protect the right-of-way and public health, safety, and welfare.

1. Type A, ROW special use permit is a short-term permit and allows the use of the right-of-way for nonconstruction activities as described in SDC 21.08.060D. 2. Type B, ROW construction permit is a permit that allows the use of the right-of-way for construction activities as described in SDC 21.08.060E. 3. Type C, ROW utility permit is a permit that allows for the use of the right-of-way to construct or maintain utilities as described in SDC 21.08.060F. 4. Type D, ROW lease permit is a permit that allows long- term usage of public right-of-way for non-construction activities as described in SDC 21.08.060G.

D. Type A right-of-way special use permit

1. Type A ROW special use permit is required for any special event that is held within the public right-of-way or creates significant traffic impacts within the public right-of-way. 2. Type A ROW special use permit may be required for uses that are non-construction uses but not defined as a special event by this chapter. 3. Proof of insurance may be required with the City listed as an additional insured to protect the public and the City against liability for injury to persons or property.

E. Type B right-of-way construction permit

1. Type B ROW construction permits are required before any person, firm, corporation, company, enterprise or entity shall commence or permit any other person, firm,

604 | Title 21: Sammamish Development Code

Effective | January 1, 2022

Made with FlippingBook Ebook Creator