Sammamish Unified Development Code

DevelopmentStandards—InterimStreetDesignStandards | PublicWorksandBuildings

Sammamish Development Code

corporation, company, enterprise or entity to commence any work within the public right-of-way. Types of activities that would fall under a Type B ROW construction permit include but are not limited to driveways, curbs, stormwater infrastructure, sidewalks, retaining walls, cutting or maintaining trees and haul routes. Construction work associated with a franchised utility provider or a telecommunications provider shall obtain a Type C ROW utility permit as described in SDC 21.08.060F. 2. Proof of insurance shall be required, with the City listed as an additional insured, on all work within the right-of- way to address liability for injury to persons or property. Insurance amounts shall be those identified in Section 1-07.18 (Public Liability and Property Damage Insurance) of the Standard Specifications for Road, Bridge and Municipal Construction (current version) published by the Washington State Department of Transportation, and City amendments thereto. These insurance requirements may be modified at the discretion of the City. 3. A current City business license is required for any person performing work in the City right-of-way. 4. It is unlawful for any person to perform any work in City right-of-way unless operating under a valid state of Washington general contractor’s license, or a valid state of Washington specialty contractor’s license applicable to the type of work being performed. 5. Contractors are responsible for traffic control, work area protection/security and street maintenance to protect the life, health and safety of the public during any permitted

work within the right-of-way, and all methods and equipment used will be subject to the approval of the City. 6. All streets, sidewalks, alleys, parkways, and other public rights-of-way disturbed in the course of work performed under any permit shall be restored in accordance with the City of Sammamish public works standards or as required and approved by the City engineer. 7. All work within City right-of-way must be pursued to completion with due diligence, and if work is not completed within a reasonable length of time, as determined by the City engineer, the City shall cause the work to be completed at the applicant’s expense. 8. Any costs incurred by the City for right-of-way restoration will be charged to the property owner and/or developer employing the contractor.

F. Type C right-of-way lease permit

1. Type C ROW utility permits are required before any person, firm, corporation, company, enterprise or entity shall commence or permit any other person, firm, or corporation to commence any work within the public right-of-way associated with providing or maintaining franchised utilities or telecommunication facilities within the City right-of-way. 2. Proof of insurance shall be required, with the City listed as an additional insured, on all work within the right-of- way to address liability for injury to persons or property. Insurance amounts shall be those identified in Section 1-07.18 (Public Liability and Property Damage Insurance) of the Standard Specifications for Road, Bridge and Municipal Construction (current version) published by the Washington

Effective | January 1, 2022

Title 21: Sammamish Development Code | 605

Made with FlippingBook Ebook Creator